The Makara Guardians Inc. is an incorporated society formed in 1997 to coordinate opposition to proposals to build wind turbines near where the members live. Makara is a rural locality 10 km west of Wellington, New Zealand. The Makara Guardians represents some 85% of the families in the Makara Valley, and consists of around 160 members http://www.scoop.co.nz/stories/AK0602/S00023.htm. Membership is restricted to residents or owners of land in Makara who support the objectives of the Society and who are aged over 18.

History

The Makara area has long been favoured as a site for building a wind farm
Wind farm
A wind farm is a group of wind turbines in the same location used to produce electric power. A large wind farm may consist of several hundred individual wind turbines, and cover an extended area of hundreds of square miles, but the land between the turbines may be used for agricultural or other...

. It is located in an area that enjoys reliably high average wind speeds for much of the year. It is close to a major metropolitan area - Wellington, and close to major transmission lines that supply the city with power. The terrain is hilly, with long ridges running 250 – 450 metres above sea level.

The Electricity Corporation of New Zealand
Electricity Corporation of New Zealand
The Electricity Corporation of New Zealand Ltd is a New Zealand state-owned enterprise formed on 1 April 1987, as a transition entity in the process of deregulating the New Zealand electricity market...

 (ECNZ) began investigating the area as a site for the development of a wind farm from 1995. It investigated a number of wind farm options ranging from an 8 to 10 turbine, 6 MW wind farm, through to approximately 50 turbines generating as much as 30 MW. ECNZ announced the 6 MW proposal in October 1997. The company also purchased a 1000 acres (4 km²) block of land in Makara known as Quartz Hill in 1997.

The Makara Guardians opposed this 6 MW development. ECNZ never applied for resource consent, and subsequently shelved the wind farm plans. The company was split up in 1999, with Meridian Energy
Meridian Energy
Meridian Energy Limited is a New Zealand state-owned electricity generator and retailer. The company generates the largest proportion of New Zealand's electricity, generating 32 percent of the country's electricity in the year ending 31 December 2009, and is the fourth-equal largest retailer, with...

 inheriting the Quartz Hill site.

In June 2005, Meridian applied for resource consent for a new wind farm, known as Project West Wind
Project West Wind
Project West Wind is a wind farm located at Terawhiti Station and Makara Farm west of Wellington, New Zealand.It is the first wind farm for the capital city, and has a capacity of 143 MW. Construction of the wind farm project began in September 2007 and was completed in late 2009...

. It was substantially larger than the earlier ENCZ proposal, consisting of 70 turbines with a total capacity of up to 210 MW. This proposal joined the Quartz Hill site with the neighbouring Terawhiti Station
Terawhiti Station
Terawhiti Station is one of New Zealand's oldest and largest sheep stations, located along the south coast of Wellington. Terawhiti Station has seen a diverse range of land uses over the past 160 years. Originally a cattle station, Terawhiti grew into one of New Zealand's largest sheep stations...

- one of New Zealand's oldest and largest privately owned stations.

A key feature of this proposal, from the Guardian's perspective was the siting of some 22 of the 125 metre-high turbines along the top of a long a ridge that looms immediately above the South Makara Valley, where many of the members live.

As soon as Meridian announced the proposal, the Makara Guardians mounted a substantial opposition campaign.

On December 21, 2005 the resource hearings commissioners announced their decision, granting the proposal to construct the wind farm at the Makara site, subject to some construction conditions.

Both Meridian and the Makara Guardians subsequently appealed the consent decision to the Environment Court. The court granted resource consent in May 2007. Project West Wind was granted 66 turbines and will now produce approximately 140MW.