ALETAR (cable system)
Encyclopedia
ALETAR is a submarine telecommunications cable system
in the Mediterranean Sea
linking Egypt and Syria.
It has landing points
in:
It has a design transmission capacity of 5 Gbit/s and a total cable length of 787 km. It started operation on 7 April 1997.
Submarine communications cable
A submarine communications cable is a cable laid on the sea bed between land-based stations to carry telecommunication signals across stretches of ocean....
in the Mediterranean Sea
Mediterranean Sea
The Mediterranean Sea is a sea connected to the Atlantic Ocean surrounded by the Mediterranean region and almost completely enclosed by land: on the north by Anatolia and Europe, on the south by North Africa, and on the east by the Levant...
linking Egypt and Syria.
It has landing points
Cable landing point
A cable landing point is the location where a submarine or other underwater cable makes landfall. The term is most often used for the landfall points of submarine telecommunications cables and submarine power cables. The landing will either be direct or via a branch from a main cable using a...
in:
- AlexandriaAlexandriaAlexandria is the second-largest city of Egypt, with a population of 4.1 million, extending about along the coast of the Mediterranean Sea in the north central part of the country; it is also the largest city lying directly on the Mediterranean coast. It is Egypt's largest seaport, serving...
, EgyptEgyptEgypt , officially the Arab Republic of Egypt, Arabic: , is a country mainly in North Africa, with the Sinai Peninsula forming a land bridge in Southwest Asia. Egypt is thus a transcontinental country, and a major power in Africa, the Mediterranean Basin, the Middle East and the Muslim world... - TartousTartousTartus is a city on the Mediterranean coast of Syria. Tartus is the second largest port city in Syria , and the largest city in Tartus Governorate. The population size is 98,000 .- Geography and climate :...
, SyriaSyriaSyria , officially the Syrian Arab Republic , is a country in Western Asia, bordering Lebanon and the Mediterranean Sea to the West, Turkey to the north, Iraq to the east, Jordan to the south, and Israel to the southwest....
It has a design transmission capacity of 5 Gbit/s and a total cable length of 787 km. It started operation on 7 April 1997.