BERYTAR (cable system)
Encyclopedia
BERYTAR is a submarine telecommunications cable system
Submarine communications cable
A submarine communications cable is a cable laid on the sea bed between land-based stations to carry telecommunication signals across stretches of ocean....

 in the Mediterranean Sea
Mediterranean Sea
The Mediterranean Sea is a sea connected to the Atlantic Ocean surrounded by the Mediterranean region and almost completely enclosed by land: on the north by Anatolia and Europe, on the south by North Africa, and on the east by the Levant...

 linking Syria and the Lebanon.

It has landing points
Cable landing point
A cable landing point is the location where a submarine or other underwater cable makes landfall. The term is most often used for the landfall points of submarine telecommunications cables and submarine power cables. The landing will either be direct or via a branch from a main cable using a...

 in:
  • Tartous
    Tartous
    Tartus is a city on the Mediterranean coast of Syria. Tartus is the second largest port city in Syria , and the largest city in Tartus Governorate. The population size is 98,000 .- Geography and climate :...

    , Syria
    Syria
    Syria , officially the Syrian Arab Republic , is a country in Western Asia, bordering Lebanon and the Mediterranean Sea to the West, Turkey to the north, Iraq to the east, Jordan to the south, and Israel to the southwest....

  • Beirut
    Beirut
    Beirut is the capital and largest city of Lebanon, with a population ranging from 1 million to more than 2 million . Located on a peninsula at the midpoint of Lebanon's Mediterranean coastline, it serves as the country's largest and main seaport, and also forms the Beirut Metropolitan...

    , Lebanon
    Lebanon
    Lebanon , officially the Republic of LebanonRepublic of Lebanon is the most common term used by Lebanese government agencies. The term Lebanese Republic, a literal translation of the official Arabic and French names that is not used in today's world. Arabic is the most common language spoken among...



It has a design transmission capacity of 5 Gbit/s and a total cable length of 134 km. It started operation on 7 April 1997.
The source of this article is wikipedia, the free encyclopedia.  The text of this article is licensed under the GFDL.
 
x
OK