Cape Canaveral Air Force Station Launch Complex 19
Encyclopedia
Launch Complex 19 is a deactivated launch site on Cape Canaveral Air Force Station
Cape Canaveral Air Force Station
Cape Canaveral Air Force Station is an installation of the United States Air Force Space Command's 45th Space Wing, headquartered at nearby Patrick Air Force Base. Located on Cape Canaveral in the state of Florida, CCAFS is the primary launch head of America's Eastern Range with four launch pads...

, Florida
Florida
Florida is a state in the southeastern United States, located on the nation's Atlantic and Gulf coasts. It is bordered to the west by the Gulf of Mexico, to the north by Alabama and Georgia and to the east by the Atlantic Ocean. With a population of 18,801,310 as measured by the 2010 census, it...

  used by NASA
NASA
The National Aeronautics and Space Administration is the agency of the United States government that is responsible for the nation's civilian space program and for aeronautics and aerospace research...

 to launch all of the Gemini manned spaceflights. It was also used by unmanned Titan I
Titan I
The Martin Marietta SM-68A/HGM-25A Titan I was the United States' first multistage ICBM . Incorporating the latest design technology when designed and manufactured, the Titan I provided an additional nuclear deterrent to complement the U.S. Air Force's SM-65 Atlas missile...

 and Titan II
Titan II GLV
The Titan II GLV or Gemini-Titan was an American expendable launch system derived from the Titan II missile, which was used to launch twelve Gemini missions for NASA between 1964 and 1966...

 launch vehicle
Launch vehicle
In spaceflight, a launch vehicle or carrier rocket is a rocket used to carry a payload from the Earth's surface into outer space. A launch system includes the launch vehicle, the launch pad and other infrastructure....

s.

LC-19 was in use from 1959 to 1966, during which time it saw 27 launches, 10 of which were manned. The first use of LC-19 was on August 14, 1959. This was a Titan I and the mission was declared a failure after the rocket exploded while still on the pad. The first successful launch from LC-19 was also a Titan I, on February 2, 1960. The launch complex was closed following the departure of Gemini XII, on November 11, 1966.

The Gemini white room from the top of the booster erector has been partially restored and is on display at the Air Force Space & Missile Museum
Air Force Space & Missile Museum
The Air Force Space & Missile Museum is located at Launch Complex 26 at Cape Canaveral Air Force Station, Florida. It includes artifacts from the early American space program and includes an outdoor rocket garden displaying rockets, missiles and space-related equipment chronicling the US Air...

 located at Complex 26
Cape Canaveral Air Force Station Launch Complex 26
Launch Complex 26 is a deactivated launch site at Cape Canaveral Air Force Station, Florida. LC-26 consisted of two pads, A and B. Pad A was used for the Jupiter-C and Juno I rockets, and was the launch site for Explorer 1, the United States' first satellite, in 1958. Pad B was used for Juno II...

.

The degradation of Pad 19 has been documented at http://pad19.org by a docent of the CCAFS Space and Missile Museum at http://spacemuseum.org.

See also

  • Gemini Program
    Gemini 1
    Gemini 1
    Gemini 1 was the first unmanned test flight of the Gemini spacecraft in NASA's Gemini program. Its main objectives were to test the structural integrity of the new spacecraft and modified Titan II ICBM...

    Gemini 2
    Gemini 2
    Gemini 2 was the second spaceflight of the American human spaceflight program Project Gemini. Gemini 2, like Gemini 1, was an unmanned mission intended as a test flight of the Gemini spacecraft. Unlike Gemini 1, which was placed into orbit, Gemini 2 made a suborbital flight, primarily intended to...

    Gemini 3
    Gemini 3
    Gemini 3 was the first manned mission in NASA's Gemini program, the second American manned space program. On March 23, 1965, the spacecraft, nicknamed The Molly Brown, performed the seventh manned US spaceflight, and the 17th manned spaceflight overall...

    Gemini 4
    Gemini 4
    Gemini 4 was the second manned space flight in NASA's Project Gemini, occurring in June 1965. It was the tenth manned American spaceflight . Astronauts James McDivitt and Edward H. White, II circled the Earth 66 times in four days, making it the first US flight to approach the five-day flight of...

    Gemini 5
    Gemini 5
    Gemini 5 was a 1965 manned spaceflight in NASA's Gemini program. It was the third manned Gemini flight, the 11th manned American flight and the 19th spaceflight of all time...


  • Gemini 7
    Gemini 7
    Gemini 7 was a 1965 manned spaceflight in NASA's Gemini program. It was the 4th manned Gemini flight, the 12th manned American flight and the 20th spaceflight of all time . The crew of Frank F. Borman, II and James A...

    Gemini 6A
    Gemini 6A
    -Backup crew:-Mission parameters:* Mass: * Perigee: * Apogee: * Inclination: 28.97°* Period: 88.7 min-Stationkeeping with GT-7:* Start: December 15, 1965 19:33 UTC* End: December 16, 1965 00:52 UTC-Objectives:...

    Gemini 8
    Gemini 8
    -Backup crew:-Mission parameters:* Mass: * Perigee: * Apogee: * Inclination: 28.91°* Period: 88.83 min-Objectives:Gemini VIII had two major objectives, of which it achieved one...

    Gemini 9A
    Gemini 9A
    - Backup crew :- Original primary crew :- Mission parameters :* Mass: * Perigee: * Apogee: * Inclination: 28.91°* Period: 88.78 min- 1st rendezvous :* June 3, 1966 - 17:45 - 18:00 UTC- Spacewalk :* Cernan...

    Gemini 10
    Gemini 10
    -Backup crew:-Mission parameters:*Mass: *Perigee: *Apogee: *Inclination: 28.87°*Period: 88.79 min-Docking:*Docked: July 19, 1966 - 04:15:00 UTC*Undocked: July 20, 1966 - 19:00:00 UTC-Space walk:...

    Gemini 11
    Gemini 11
    Gemini 11 was the ninth manned spaceflight mission of NASA's Project Gemini, which flew from September 12 to 15, 1966. It was the 17th manned American flight and the 25th spaceflight to that time . Astronauts Charles "Pete" Conrad, Jr. and Richard F. Gordon, Jr...

    Gemini 12
    Gemini 12
    -Backup crew:-Mission parameters:*Mass: *Perigee: *Apogee: *Inclination: 28.87°*Period: 88.87 min-Docking:*Docked: November 12, 1966 - 01:06:00 UTC*Undocked: November 13, 1966 - 20:18:00 UTC-Space walk:...

  • Titan I
    Titan I
    The Martin Marietta SM-68A/HGM-25A Titan I was the United States' first multistage ICBM . Incorporating the latest design technology when designed and manufactured, the Titan I provided an additional nuclear deterrent to complement the U.S. Air Force's SM-65 Atlas missile...

  • Titan II
    Titan II GLV
    The Titan II GLV or Gemini-Titan was an American expendable launch system derived from the Titan II missile, which was used to launch twelve Gemini missions for NASA between 1964 and 1966...

The source of this article is wikipedia, the free encyclopedia.  The text of this article is licensed under the GFDL.
 
x
OK