Comanche Peak Nuclear Generating Station
Encyclopedia
Comanche Peak Nuclear Power Plant is located in Somervell County, Texas
Somervell County, Texas
There were 2,438 households out of which 37.40% had children under the age of 18 living with them, 61.70% were married couples living together, 9.60% had a female householder with no husband present, and 24.50% were non-families. 21.30% of all households were made up of individuals and 9.20% had...

. The nuclear power plant
Nuclear power plant
A nuclear power plant is a thermal power station in which the heat source is one or more nuclear reactors. As in a conventional thermal power station the heat is used to generate steam which drives a steam turbine connected to a generator which produces electricity.Nuclear power plants are usually...

 is located 40 miles (65 km) southwest of Ft. Worth and about 60 miles (100 km) southwest of Dallas
Dallas, Texas
Dallas is the third-largest city in Texas and the ninth-largest in the United States. The Dallas-Fort Worth Metroplex is the largest metropolitan area in the South and fourth-largest metropolitan area in the United States...

. It relies on nearby Squaw Creek Reservoir
Squaw Creek Reservoir
Squaw Creek Reservoir is an 3,275 acre impoundment located between Glen Rose, Texas and Granbury, Texas. The primary purpose is cooling for Comanche Peak Nuclear Generating Station...

 for cooling water. The plant has about 1,300 employees and is operated by Luminant
Luminant
Luminant is a Texas-based electric utility. It is a wholly owned subsidiary of Energy Future Holdings Corporation. Luminant's operations include electricity generation and wholesaling, mining, construction, and development...

 Generation, a subsidiary of Energy Future Holdings Corporation.

Construction of the two Westinghouse
Westinghouse Electric Company
Westinghouse Electric Company LLC is a nuclear power company, offering a wide range of nuclear products and services to utilities throughout the world, including nuclear fuel, service and maintenance, instrumentation and control and advanced nuclear plant designs...

 pressurized water reactor
Pressurized water reactor
Pressurized water reactors constitute a large majority of all western nuclear power plants and are one of three types of light water reactor , the other types being boiling water reactors and supercritical water reactors...

s began in 1974. Unit 1, originally rated at 1,084 MWe
MWE
MWE may refer to:*Manufacturer's Weight Empty*McDermott Will & Emery*Midwest Express, an airline*Merowe Airport - IATA code*Multiword expressionMWe may refer to:*Megawatt electrical...

, came online on April 17, 1990. Its current, 40-year operating license is valid until February 8, 2030. Unit 2, 1,124 MWe, followed on April 6, 1993 and is licensed to operate until February 2, 2033 when it has to renew its license. Unit 2 was the second-last power reactor to come online in the USA, followed only by Watts Bar 1
Watts Bar Nuclear Generating Station
The Watts Bar Nuclear Generating Station is a Tennessee Valley Authority nuclear reactor used for electric power generation and tritium production for nuclear weapons. It is located on a 1,770-acre site in Rhea County, Tennessee, near Spring City, between the cities of Chattanooga and Knoxville...

.

In June 2008, the U.S. Nuclear Regulatory Commission
Nuclear Regulatory Commission
The Nuclear Regulatory Commission is an independent agency of the United States government that was established by the Energy Reorganization Act of 1974 from the United States Atomic Energy Commission, and was first opened January 19, 1975...

 (NRC) approved a request to increase the generating capacity of units 1 and 2 by approximately 4.5% each. Luminant Generation Co. implemented the changes during refueling outages. Unit 1 was uprated in autumn 2008 with a capacity increase of approximately 1,210 to 1,259 MWe and Unit 2, the capacity of which rose from an estimated 1,208 to 1,245 MWe, was uprated in autumn 2009.

Surrounding population

The Nuclear Regulatory Commission
Nuclear Regulatory Commission
The Nuclear Regulatory Commission is an independent agency of the United States government that was established by the Energy Reorganization Act of 1974 from the United States Atomic Energy Commission, and was first opened January 19, 1975...

 defines two emergency planning zones around nuclear power plants: a plume exposure pathway zone with a radius of 10 miles (16.1 km), concerned primarily with exposure to, and inhalation of, airborne radioactive contamination, and an ingestion pathway zone of about 50 miles (80.5 km), concerned primarily with ingestion of food and liquid contaminated by radioactivity.

The 2010 U.S. population within 10 miles (16.1 km) of Comanche Peak was 30,653, an increase of 44.1 percent in a decade, according to an analysis of U.S. Census data for msnbc.com. The 2010 U.S. population within 50 miles (80.5 km) was 1,755,528, an increase of 22.9 percent since 2000. Cities within 50 miles include Fort Worth (41 miles to city center).

Units 3 and 4

On September 19, 2008, Luminant filed an application with the NRC for a Combined Construction and Operating License
Combined Construction and Operating License
The Combined Construction and Operating License replaced the previous Draft Regulatory Guide 1145 as the licensing process for new nuclear power plants in the United States...

 (COL) for two new reactors. The reactor design selected is the US version of the 1,700 MWe
MWE
MWE may refer to:*Manufacturer's Weight Empty*McDermott Will & Emery*Midwest Express, an airline*Merowe Airport - IATA code*Multiword expressionMWe may refer to:*Megawatt electrical...

 Advanced Pressurized Water Reactor
Advanced Pressurized Water Reactor
Westinghouse Electric Company's AP1000 reactor design is the first Generation III+ reactor to receive final design approval from the U.S. Nuclear Regulatory Commission ....

 (US-APWR), developed by Mitsubishi Heavy Industries
Mitsubishi Heavy Industries
, or MHI, is a Japanese company. It is one of the core companies of Mitsubishi Group.-History:In 1870 Yataro Iwasaki, the founder of Mitsubishi took a lease of Government-owned Nagasaki Shipyard. He named it Nagasaki Shipyard & Machinery Works, and started the shipbuilding business on a full scale...

 (MHI). The project is a joint venture, with Luminant owning 88 percent and 12 percent owned by MHI.
Luminant did not release an estimate of the project's cost, but CEO David Campbell said Luminant would try to build its new reactors at the low end of current industry estimates, which he said range from $2,500 to $6,000 a kilowatt — $8.5 billion to $20.4 billion for a 3,400 MW plant.

Some environmental and anti-nuclear organizations
Anti-nuclear movement in the United States
The anti-nuclear movement in the United States consists of more than 80 anti-nuclear groups which have acted to oppose nuclear power or nuclear weapons, or both, in the United States. These groups include the Abalone Alliance, Clamshell Alliance, Institute for Energy and Environmental Research,...

 and individuals oppose the plant expansion, citing environmental, public safety and cost concerns. These include the Sustainable Energy and Economic Development Coalition, Public Citizen
Public Citizen
Public Citizen is a non-profit, consumer rights advocacy group based in Washington, D.C., United States, with a branch in Austin, Texas. Public Citizen was founded by Ralph Nader in 1971, headed for 26 years by Joan Claybrook, and is now headed by Robert Weissman.-Lobbying Efforts:Public Citizen...

 and state Rep. Lon Burnam
Lon Burnam
Lon Maxwell Burnam is the Texas state representative for Texas House district 90, which encompasses downtown Fort Worth and surrounding areas. Burnam, a Democrat, serves as the executive director of the Dallas Peace Center....

.

Seismic risk

The Nuclear Regulatory Commission's estimate of the risk each year of an earthquake intense enough to cause core damage to the reactor at Comanche Peak was 1 in 250,000, according to an NRC study published in August 2010.

Reactor data

The Comanche Peak Nuclear Power Plant consist of two operational reactors, two additional units are planned.
Reactor unit Reactor type Capacity Construction started Electricity grid connection Commercial operation Shutdown
Net Gross
Comanche Peak-1 Westinghouse 4-loop 1209 MW 1259 MW 19.12.1974 24.04.1990 13.08.1990
Comanche Peak-2 Westinghouse 4-loop 1158 MW 1189 MW 19.12.1974 09.04.1993 03.08.1993
Comanche Peak-3 (planned) US-APWR 1700 MW MW
Comanche Peak-4 (planned) US-APWR 1700 MW MW