Coventry (RTA Rapid Transit station)
Encyclopedia
Coventry is a station stop on the RTA Green Line
in Cleveland, Ohio
, USA. It is located at the intersection
of Coventry Road and Shaker Boulevard (Ohio State Route 87) on the border between Cleveland and Shaker Heights
.
The station comprises two side platforms west of the intersection. There is a relatively large Tudor-style
station house on the westbound platform.
The rail line was in the nature of a streetcar line, and it ran from the existing tracks on Fairmount Boulevard, south on Coventry Road, and then east along the newly laid-out boulevard. At that time, there was no Shaker Boulevard west of Coventry, and Coventry did not extend south beyond Shaker, so the future Shaker Boulevard was simply an extension of Coventry. The line was built by Cleveland Interurban Railroad (CIRR) and initially operated by the Cleveland Railway, which operated the streetcar line on Fairmount Boulevard. Trains ran from the terminus at Fontenay Road, down Coventry Road, and then to downtown Cleveland using the Cleveland Railway tracks from Fairmount Boulevard.
In 1920, the line was extended west from Coventry Road along new right-of-way
to East 34th Street where the trains resumed traveling on Cleveland Railway tracks to downtown Cleveland. Service on this new line began from Shaker Boulevard on April 16, 1920. The new line significantly reduced travel time to downtown as considerable street running was eliminated. However, at CIRR's request Cleveland Railway continued to operate shuttle service along Coventry Road from Fairmount Boulevard to Shaker Boulevard, and this service was subsidized by CIRR. A station house with a waiting room
was constructed at Coventry Road and Shaker Boulevard to serve passengers making the connection. It was constructed by Standard Oil Company of Ohio
at a cost of $17,500, and it included two gasoline pumps along westbound Shaker Boulevard. Sohio's construction price was applied against a long-term lease with CIRR
The Coventry Road shuttle service lasted only until March 12, 1923. When CIRR discontinued the subsidy and the service ended, there were numerous objections, and even a lawsuit by the City of Cleveland Heights
. CIRR prevailed and formally petitioned the Ohio Public Utilities Commission to abandon the right-of-way on Coventry Road on June 17, 1925. The need for the station house at Coventry station ended, but the service station
there continued for many years. After the station house's use as a service station ended, it was leased to a series of tenants for other uses.
There have been several other proposals to connect the Shaker Boulevard rapid transit line with the streetcar line on Fairmount Boulevard. The Fairmount line was perpetually plagued with low ridership, and a connection to the Shaker line was seen as a way to improve service and make the Fairmount line more attractive to riders. In 1922, Cleveland Railway proposed a connection from Moreland Circle (now Shaker Square
) along North Moreland Boulevard and what is now Fairhill Road (then called Fairmount Road) to the existing tracks on Coventry Road. The trackage for the entire connection would run in the median of divided
boulevards
.
Prior to the conversion of the Fairmount streetcar line to bus service in 1948, the Cleveland Transit System (CTS), which had taken over operation of the Cleveland streetcar lines in 1941 attempted to have the Shaker Heights Rapid Transit (then operated by the City of Shaker Heights) take over the Fairmount line from Coventry Road to its terminus at Canterbury Road. The same route as in 1922 was proposed to connect the lines, and CTS further proposed extending the Fairmount line eastward to Fairmount Circle where it could attract more riders from John Carroll University
. However, Shaker Heights lacked the money to undertake the work, and Fairmount Boulevard streetcar service soon ended.
In 1980 and 1981, the Green and Blue Lines were completely renovated with new track, ballast, poles and wiring, and new stations were built along the line. The historic Coventry station house—its days as a gasoline service station long ended—was renovated with the addition of new exterior waiting spaces. However, the old yellow station sign was retained, the only one left on the Shaker and Van Aken lines. The renovated line along Shaker Boulevard opened on October 11, 1980.
Blue and Green Lines (Cleveland)
The Blue Line, Green Line, and Waterfront Line are the interurban/light rail component of the RTA Rapid Transit, a rapid transit rail system in greater Cleveland and Shaker Heights, Cuyahoga County, Ohio...
in Cleveland, Ohio
Cleveland, Ohio
Cleveland is a city in the U.S. state of Ohio and is the county seat of Cuyahoga County, the most populous county in the state. The city is located in northeastern Ohio on the southern shore of Lake Erie, approximately west of the Pennsylvania border...
, USA. It is located at the intersection
Intersection (road)
An intersection is a road junction where two or more roads either meet or cross at grade . An intersection may be 3-way - a T junction or fork, 4-way - a crossroads, or 5-way or more...
of Coventry Road and Shaker Boulevard (Ohio State Route 87) on the border between Cleveland and Shaker Heights
Shaker Heights, Ohio
Shaker Heights is a city in Cuyahoga County, Ohio, United States. As of the 2010 Census, the city population was 28,448. It is an inner-ring streetcar suburb of Cleveland that abuts the city on its eastern side.-Topography:Shaker Heights is located at...
.
The station comprises two side platforms west of the intersection. There is a relatively large Tudor-style
Tudorbethan architecture
The Tudor Revival architecture of the 20th century , first manifested itself in domestic architecture beginning in the United Kingdom in the mid to late 19th century based on a revival of aspects of Tudor style. It later became an influence in some other countries, especially the British colonies...
station house on the westbound platform.
History
The station opened on December 17, 1913 with the initiation of rail service on what is now Shaker Boulevard.The rail line was in the nature of a streetcar line, and it ran from the existing tracks on Fairmount Boulevard, south on Coventry Road, and then east along the newly laid-out boulevard. At that time, there was no Shaker Boulevard west of Coventry, and Coventry did not extend south beyond Shaker, so the future Shaker Boulevard was simply an extension of Coventry. The line was built by Cleveland Interurban Railroad (CIRR) and initially operated by the Cleveland Railway, which operated the streetcar line on Fairmount Boulevard. Trains ran from the terminus at Fontenay Road, down Coventry Road, and then to downtown Cleveland using the Cleveland Railway tracks from Fairmount Boulevard.
In 1920, the line was extended west from Coventry Road along new right-of-way
Right-of-way (railroad)
A right-of-way is a strip of land that is granted, through an easement or other mechanism, for transportation purposes, such as for a trail, driveway, rail line or highway. A right-of-way is reserved for the purposes of maintenance or expansion of existing services with the right-of-way...
to East 34th Street where the trains resumed traveling on Cleveland Railway tracks to downtown Cleveland. Service on this new line began from Shaker Boulevard on April 16, 1920. The new line significantly reduced travel time to downtown as considerable street running was eliminated. However, at CIRR's request Cleveland Railway continued to operate shuttle service along Coventry Road from Fairmount Boulevard to Shaker Boulevard, and this service was subsidized by CIRR. A station house with a waiting room
Waiting room
A waiting room is a building, or more commonly a part of a building where people sit or stand until the event they are waiting for occurs.There are generally two types of waiting room. One is where individuals leave one at a time, for instance at a doctor's office or a hospital, or outside a school...
was constructed at Coventry Road and Shaker Boulevard to serve passengers making the connection. It was constructed by Standard Oil Company of Ohio
Standard Oil of Ohio
Standard Oil of Ohio or Sohio was an American oil company that was acquired by British Petroleum, now called BP.It was one of the successor companies to Standard Oil after the antitrust breakup in 1911. Standard Oil of Ohio was the original Standard Oil company founded by John D. Rockefeller. It...
at a cost of $17,500, and it included two gasoline pumps along westbound Shaker Boulevard. Sohio's construction price was applied against a long-term lease with CIRR
The Coventry Road shuttle service lasted only until March 12, 1923. When CIRR discontinued the subsidy and the service ended, there were numerous objections, and even a lawsuit by the City of Cleveland Heights
Cleveland Heights, Ohio
Cleveland Heights is a city in Cuyahoga County, Ohio, United States, a suburb of Cleveland. The city's population was 46,121 at the 2010 census.-Geography:Cleveland Heights is located at ....
. CIRR prevailed and formally petitioned the Ohio Public Utilities Commission to abandon the right-of-way on Coventry Road on June 17, 1925. The need for the station house at Coventry station ended, but the service station
Filling station
A filling station, also known as a fueling station, garage, gasbar , gas station , petrol bunk , petrol pump , petrol garage, petrol kiosk , petrol station "'servo"' in Australia or service station, is a facility which sells fuel and lubricants...
there continued for many years. After the station house's use as a service station ended, it was leased to a series of tenants for other uses.
There have been several other proposals to connect the Shaker Boulevard rapid transit line with the streetcar line on Fairmount Boulevard. The Fairmount line was perpetually plagued with low ridership, and a connection to the Shaker line was seen as a way to improve service and make the Fairmount line more attractive to riders. In 1922, Cleveland Railway proposed a connection from Moreland Circle (now Shaker Square
Shaker Square
Buckeye-Shaker is a neighborhood on the East Side of Cleveland, Ohio. It encompasses the old Buckeye neighborhood and Shaker Square neighborhood, the latter of which is centered around an historic shopping district and an eponymous rapid transit station, located at the intersection of Shaker and...
) along North Moreland Boulevard and what is now Fairhill Road (then called Fairmount Road) to the existing tracks on Coventry Road. The trackage for the entire connection would run in the median of divided
Dual carriageway
A dual carriageway is a class of highway with two carriageways for traffic travelling in opposite directions separated by a central reservation...
boulevards
Boulevards
Boulevards is a network of city guides on the Internet established in 1994 by Boulevards New Media Inc., an early digital media pioneer. It preceded other city guide networks such as Citysearch and Microsoft's now-defunct Sidewalk.com product, which launched under a similarly metaphorical brand and...
.
Prior to the conversion of the Fairmount streetcar line to bus service in 1948, the Cleveland Transit System (CTS), which had taken over operation of the Cleveland streetcar lines in 1941 attempted to have the Shaker Heights Rapid Transit (then operated by the City of Shaker Heights) take over the Fairmount line from Coventry Road to its terminus at Canterbury Road. The same route as in 1922 was proposed to connect the lines, and CTS further proposed extending the Fairmount line eastward to Fairmount Circle where it could attract more riders from John Carroll University
John Carroll University
John Carroll University is a private, co-educational Jesuit Catholic university in University Heights, Ohio, United States, a suburb of Cleveland. The university was founded in 1886 by the Society of Jesus as Saint Ignatius College.The university was founded in 1886 by the Society of Jesus, as...
. However, Shaker Heights lacked the money to undertake the work, and Fairmount Boulevard streetcar service soon ended.
In 1980 and 1981, the Green and Blue Lines were completely renovated with new track, ballast, poles and wiring, and new stations were built along the line. The historic Coventry station house—its days as a gasoline service station long ended—was renovated with the addition of new exterior waiting spaces. However, the old yellow station sign was retained, the only one left on the Shaker and Van Aken lines. The renovated line along Shaker Boulevard opened on October 11, 1980.