Future plans
The highway is currently being studied for expansion by WisDOT. This includes possible bypass options of Hortonville and capacity expansion. The limits of the study are from US 45 in New London to WIS 76 in Greenville (where the current multilane expressway begins)
The source of this article is
wikipedia, the free encyclopedia. The text of this article is licensed under the
GFDL.