LaSalle County Nuclear Generating Station
Encyclopedia
LaSalle County Nuclear Generating Station, located 11 miles (17.7 km) southeast of Ottawa, Illinois
serves Chicago
and northern Illinois
with electricity. The plant is owned and operated by the Exelon Corporation. Its Units 1 and 2 began commercial operation in August 1982 and April 1984, respectively.
It has two General Electric
boiling water reactor
s. LaSalle's Unit 1 is capable of generating 1,138 net megawatts, while Unit 2 is capable of generating 1,150 net megawatts, together generating a total of 2,280 net megawatts which is enough electricity to support the electricity needs of more than two million average American homes.
Instead of cooling tower
s, the station has a 2058 acres (8.3 km²) man-made cooling lake, which is also a popular fishery — LaSalle Lake State Fish and Wildlife Area
— managed by the Illinois Department of Natural Resources
.
LaSalle County Station units 1 and 2 currently holds the world record top two spots for run time without shutting down for boiling water reactor
s, 739 and 712 days respectively. Both cycles were breaker to breaker.
defines two emergency planning zones around nuclear power plants: a plume exposure pathway zone with a radius of 10 miles (16.1 km), concerned primarily with exposure to, and inhalation of, airborne radioactive contamination, and an ingestion pathway zone of about 50 miles (80.5 km), concerned primarily with ingestion of food and liquid contaminated by radioactivity.
The 2010 U.S. population within 10 miles (16.1 km) of LaSalle was 17,643, an increase of 7.1 percent in a decade, according to an analysis of U.S. Census data for msnbc.com. The 2010 U.S. population within 50 miles (80.5 km) was 1,902,775, an increase of 22.6 percent since 2000. Cities within 50 miles include Joliet (34 miles to city center).
the reactor. The reactor had been operating at 6 percent power output at the time. Plant instruments indicated three of 185 control rods used to shut down the reactor were not fully inserted triggering the emergency declaration. After a reset, the plant's instruments indicated that only one control rod was not fully inserted, not three. The emergency ended at 4:27 AM with no damage or release of radioactivity.
Post trip evaluations have confirmed that all control rods were fully inserted within four minutes of the reactor SCRAM. A review indicates the problem was with the indication sensors, and that all control rods were fully inserted immediately at the time of the reactor scram. Follow-up evaluations also demonstrated that even if the three subject control rods remained fully withdrawn in a cold shutdown condition, the reactor would have remained adequately shutdown.
Ottawa, Illinois
Ottawa is a city located at the confluence of the Illinois River and Fox River in LaSalle County, Illinois, USA. As of the 2010 census, the city population was 18,786...
serves Chicago
Chicago
Chicago is the largest city in the US state of Illinois. With nearly 2.7 million residents, it is the most populous city in the Midwestern United States and the third most populous in the US, after New York City and Los Angeles...
and northern Illinois
Illinois
Illinois is the fifth-most populous state of the United States of America, and is often noted for being a microcosm of the entire country. With Chicago in the northeast, small industrial cities and great agricultural productivity in central and northern Illinois, and natural resources like coal,...
with electricity. The plant is owned and operated by the Exelon Corporation. Its Units 1 and 2 began commercial operation in August 1982 and April 1984, respectively.
It has two General Electric
General Electric
General Electric Company , or GE, is an American multinational conglomerate corporation incorporated in Schenectady, New York and headquartered in Fairfield, Connecticut, United States...
boiling water reactor
Boiling water reactor
The boiling water reactor is a type of light water nuclear reactor used for the generation of electrical power. It is the second most common type of electricity-generating nuclear reactor after the pressurized water reactor , also a type of light water nuclear reactor...
s. LaSalle's Unit 1 is capable of generating 1,138 net megawatts, while Unit 2 is capable of generating 1,150 net megawatts, together generating a total of 2,280 net megawatts which is enough electricity to support the electricity needs of more than two million average American homes.
Instead of cooling tower
Cooling tower
Cooling towers are heat removal devices used to transfer process waste heat to the atmosphere. Cooling towers may either use the evaporation of water to remove process heat and cool the working fluid to near the wet-bulb air temperature or in the case of closed circuit dry cooling towers rely...
s, the station has a 2058 acres (8.3 km²) man-made cooling lake, which is also a popular fishery — LaSalle Lake State Fish and Wildlife Area
LaSalle Lake State Fish and Wildlife Area
LaSalle Lake State Fish and Wildlife Area is an Illinois state park on in LaSalle County, Illinois, United States. It is a man-made lake, built as a cooling pond for the LaSalle County Generating Station....
— managed by the Illinois Department of Natural Resources
Illinois Department of Natural Resources
The Illinois Department of Natural Resources is a cabinet-level department of the state government of Illinois. It is headquartered in the state capital of Springfield...
.
LaSalle County Station units 1 and 2 currently holds the world record top two spots for run time without shutting down for boiling water reactor
Boiling water reactor
The boiling water reactor is a type of light water nuclear reactor used for the generation of electrical power. It is the second most common type of electricity-generating nuclear reactor after the pressurized water reactor , also a type of light water nuclear reactor...
s, 739 and 712 days respectively. Both cycles were breaker to breaker.
Surrounding population
The Nuclear Regulatory CommissionNuclear Regulatory Commission
The Nuclear Regulatory Commission is an independent agency of the United States government that was established by the Energy Reorganization Act of 1974 from the United States Atomic Energy Commission, and was first opened January 19, 1975...
defines two emergency planning zones around nuclear power plants: a plume exposure pathway zone with a radius of 10 miles (16.1 km), concerned primarily with exposure to, and inhalation of, airborne radioactive contamination, and an ingestion pathway zone of about 50 miles (80.5 km), concerned primarily with ingestion of food and liquid contaminated by radioactivity.
The 2010 U.S. population within 10 miles (16.1 km) of LaSalle was 17,643, an increase of 7.1 percent in a decade, according to an analysis of U.S. Census data for msnbc.com. The 2010 U.S. population within 50 miles (80.5 km) was 1,902,775, an increase of 22.6 percent since 2000. Cities within 50 miles include Joliet (34 miles to city center).
Site area emergency
On February 20, 2006, a "site area emergency" was declared at the plant at 12:28 AM. This was the first SAE declared at a US nuclear plant since 1991. Workers were shutting down Unit 1 for refueling when the plant's turbine control system malfunctioned, SCRAMingScram
A scram or SCRAM is an emergency shutdown of a nuclear reactor – though the term has been extended to cover shutdowns of other complex operations, such as server farms and even large model railroads...
the reactor. The reactor had been operating at 6 percent power output at the time. Plant instruments indicated three of 185 control rods used to shut down the reactor were not fully inserted triggering the emergency declaration. After a reset, the plant's instruments indicated that only one control rod was not fully inserted, not three. The emergency ended at 4:27 AM with no damage or release of radioactivity.
Post trip evaluations have confirmed that all control rods were fully inserted within four minutes of the reactor SCRAM. A review indicates the problem was with the indication sensors, and that all control rods were fully inserted immediately at the time of the reactor scram. Follow-up evaluations also demonstrated that even if the three subject control rods remained fully withdrawn in a cold shutdown condition, the reactor would have remained adequately shutdown.