Madawaska HVDC
Encyclopedia
The Madawaska HVDC link between the Canadian provinces of Quebec
Quebec
Quebec or is a province in east-central Canada. It is the only Canadian province with a predominantly French-speaking population and the only one whose sole official language is French at the provincial level....

 and New Brunswick
New Brunswick
New Brunswick is one of Canada's three Maritime provinces and is the only province in the federation that is constitutionally bilingual . The provincial capital is Fredericton and Saint John is the most populous city. Greater Moncton is the largest Census Metropolitan Area...

 is located in Quebec near the village of Degelis with a connection into New Brunswick near the city of Edmundston. This 350 MW thyristor-valve back-to-back HVDC station (with a winter overload rating of 435 MW) was completed in 1985 and connects the 315 kV Quebec transmission system with the 345 kV system in New Brunswick.

Madawaska was built by General Electric
General Electric
General Electric Company , or GE, is an American multinational conglomerate corporation incorporated in Schenectady, New York and headquartered in Fairfield, Connecticut, United States...

and is based on their earlier design of the world's first fully thyristor valve link, the 320 MW Eel River back-to-back HVDC station near Dalhousie, NB. However, instead of using synchronous condensers for voltage control and reactive power supply to the thyristors, Madawaska uses switched filter and shunt reactor banks connected to the high voltage busses on each side.

The above information is based on my personal experience (as System Operations Engineer) with New Brunswick Power, serving as their on-site representative at Madawaska during its commissioning over the summer and fall of 1985. I had previously submitted information on Madawaska HVDC on a page that was deleted from the 'world list of HVDC stations'.
The source of this article is wikipedia, the free encyclopedia.  The text of this article is licensed under the GFDL.
 
x
OK