During the first 40 years that nuclear waste was being created in the United States, no legislation was enacted to manage its disposal. Nuclear waste, some of which remains dangerously radioactive with a half-life
of more than one million years, was kept in various types of temporary storage. Of particular concern during nuclear waste disposal are two long-lived fission products, Tc-99 (half-life 220,000 years) and I-129 (half-life 17 million years), which dominate spent fuel radioactivity after a few thousand years. The most troublesome transuranic elements in spent fuel are Np-237 (half-life two million years) and Pu-239 (half-life 24,000 years).
Most existing nuclear waste came from production of nuclear weapons. About 77 million gallons of military nuclear waste in liquid form was stored in steel tanks, mostly in South Carolina, Washington and Idaho. In the private sector, 82 nuclear plants operating in 1982 used uranium fuel to produce electricity. Highly radioactive spent fuel rods were stored in pools of water at reactor sites, but many utilities were running out of storage space.
The Nuclear Waste Policy Act of 1982 created a timetable and procedure for establishing a permanent, underground repository for high-level radioactive waste
by the mid-1990s, and provided for some temporary federal storage of waste, including spent fuel from civilian nuclear reactors. State governments were authorized to veto a national government decision to place a waste repository within their borders, and the veto would stand unless both houses of Congress voted to override it. The Act also called for developing plans by 1985 to build monitored retrievable storage (MRS) facilities, where wastes could be kept for 50 to 100 years or more and then be removed for permanent disposal or for reprocessing.
Congress assigned responsibility to the U.S. Department of Energy (DOE) to site, construct, operate, and close a repository for the disposal of spent nuclear fuel and high-level radioactive waste. The U.S. Environmental Protection Agency (EPA) was directed to set public health and safety standards for releases of radioactive materials from a repository, and the U.S. Nuclear Regulatory Commission (NRC) was required to promulgate regulations governing construction, operation, and closure of a repository. Generators and owners of spent nuclear fuel and high-level radioactive waste were required to pay the costs of disposal of such radioactive materials. The waste program, which was expected to cost billions of dollars, would be funded through a fee paid by electric utilities on nuclear-generated electricity. An Office of Civilian Radioactive Waste Management was established in the U.S. Department of Energy (DOE) to implement the Act.
Locations considered to be leading contenders for a permanent repository were basalt formations at the government's Hanford Nuclear Reservation in Washington; volcanic tuff formations at its Nevada nuclear test site, and several salt formations in Utah, Texas, Louisiana and Mississippi. Salt and granite formations in other states from Maine to Georgia had also been surveyed, but not evaluated in great detail.
The President was required to review site recommendations and submit to Congress by March 31, 1987 his recommendation of one site for the first repository, and by March 31, 1990, his recommendation for a second repository. The amount of high-level waste or spent fuel that could be placed in the first repository was limited to the equivalent of 70,000 metric tons of heavy metal until a second repository was built. The Act required the national government to take ownership of all nuclear waste or spent fuel at the reactor site, transport it to the repository, and thereafter be responsible for its containment.
, Nevada as the only site to be characterized as a permanent repository for all of the nation's nuclear waste. The plan was added to the fiscal 1988 budget reconciliation bill signed on December 22, 1987.
Working under the 1982 Act, DOE had narrowed down the search for the first nuclear-waste repository to three Western states: Nevada, Washington and Texas. The amendment repealed provisions in the 1982 law calling for a second repository in the eastern United States. No one from Nevada participated on the House-Senate conference committee on reconciliation.
The amendment explicitly named Yucca Mountain as the only site where DOE was to consider for a permanent repository for the nation's highly radioactive waste. Years of study and procedural steps remained. The amendment also authorized a monitored retrievable storage facility, but not until the permanent repository was licensed.
Early in 2002 the Secretary of Energy recommended Yucca Mountain for the only repository and President Bush approved the recommendation. Nevada exercised its state veto in April 2002 but the veto was overridden by both houses of Congress by mid-July 2002. In 2004, the U.S. Court of Appeals for the District of Columbia Circuit upheld a challenge by Nevada, ruling that EPA’s 10,000-year compliance period for isolation of radioactive waste was not consistent with National Academy of Sciences (NAS) recommendations and was too short. The NAS report had recommended standards be set for the time of peak risk, which might approach a period of one million years By limiting the compliance time to 10,000 years, EPA did not respect a statutory requirement that it develop standards consistent with NAS recommendations. The EPA subsequently revised the standards to extend out to 1 million years. A License Application was submitted in the summer of 2008 and is presently under review by the Nuclear Regulatory Commission.
The Obama Administration
rejected use of the site in the 2010 United States Federal Budget
budget, which eliminated all funding except that needed to answer inquiries from the Nuclear Regulatory Commission, "while the Administration devises a new strategy toward nuclear waste disposal." However, the NWPA is still the federal law and is not a project of the President and can not be canceled by either Obama or Chu. On March 5, 2009, Energy Secretary
Steven Chu
told a Senate hearing the Yucca Mountain site is no longer viewed as an option for storing reactor waste. In Obama's 2011 budget proposal released February 1, all funding for nuclear waste disposal was zeroed out for the next ten years and it proposed to dissolve the Office of Civilian Waste Management required by the NWPA. In late February 2010 multiple lawsuits were proposed and/or being filed in various federal courts across the country to contest the legality of Chu's direction to DOE to withdraw the license application. These lawsuits were evidently foreseen as eventually being necessary to enforce the NWPA since Section 119 of the NWPA provides for federal court interventions if the President, Secretary of Energy or the Nuclear Regulatory Commission fail to uphold the NWPA.
, Nobel laureate in physics, described the as yet unresolved dilemma of permanent radioactive waste disposal:
“The problem is how to keep radioactive waste in storage until it decays after hundreds of thousands of years. The [geologic] deposit must be absolutely reliable as the quantities of poison are tremendous. It is very difficult to satisfy these requirements for the simple reason that we have had no practical experience with such a long term project. Moreover permanently guarded storage requires a society with unprecedented stability.”
Thus, Alfvén identified two fundamental prerequisites for effective management of high-level radioactive waste: (1) stable geological formations, and (2) stable human institutions over hundreds of thousands of years. However, no known human civilization has ever endured for so long. Moreover, no geologic formation of adequate size for a permanent radioactive waste repository has yet been discovered that has been stable for so long a period.
Because some radioactive species have half-lives longer than one million years, even very low container leakage and radionuclide migration rates must be taken into account. Moreover, it may require more than one half-life until some nuclear waste loses enough radioactivity so that it is no longer lethal to humans. Waste containers have a modeled lifetime of 12,000 to over 100,000 years and it is assumed they will fail in about two million years. A 1983 review of the Swedish radioactive waste disposal program by the National Academy of Sciences found that country’s estimate of about one million years being necessary for waste isolation “fully justified.”
The Nuclear Waste Policy Act did not require anything approaching this standard for permanent deep-geologic disposal of high-level radioactive waste in the United States. U.S. Department of Energy
guidelines for selecting locations for permanent deep-geologic high-level radioactive waste repositories required containment of waste within waste packages for only 300 years. A site would be disqualified from further consideration only if groundwater travel time from the “disturbed zone” of the underground facility to the “accessible environment” (atmosphere, land surface, surface water, oceans or lithosphere extending no more than 10 kilometers from the underground facility) was expected to be less than 1,000 years along any pathway of radionuclide travel. Sites with groundwater travel time greater than 1,000 years from the original location to the human environment were considered potentially acceptable, even if the waste would be highly radioactive for 200,000 years or more.
Moreover, the term “disturbed zone” was defined in the regulations to exclude shafts drilled into geologic structures from the surface, so the standard applied to natural geologic pathways was more stringent than the standard applied to artificial pathways of radionuclide travel created during construction of the facility.
Half-life
Half-life, abbreviated t½, is the period of time it takes for the amount of a substance undergoing decay to decrease by half. The name was originally used to describe a characteristic of unstable atoms , but it may apply to any quantity which follows a set-rate decay.The original term, dating to...
of more than one million years, was kept in various types of temporary storage. Of particular concern during nuclear waste disposal are two long-lived fission products, Tc-99 (half-life 220,000 years) and I-129 (half-life 17 million years), which dominate spent fuel radioactivity after a few thousand years. The most troublesome transuranic elements in spent fuel are Np-237 (half-life two million years) and Pu-239 (half-life 24,000 years).
Most existing nuclear waste came from production of nuclear weapons. About 77 million gallons of military nuclear waste in liquid form was stored in steel tanks, mostly in South Carolina, Washington and Idaho. In the private sector, 82 nuclear plants operating in 1982 used uranium fuel to produce electricity. Highly radioactive spent fuel rods were stored in pools of water at reactor sites, but many utilities were running out of storage space.
The Nuclear Waste Policy Act of 1982 created a timetable and procedure for establishing a permanent, underground repository for high-level radioactive waste
Radioactive waste
Radioactive wastes are wastes that contain radioactive material. Radioactive wastes are usually by-products of nuclear power generation and other applications of nuclear fission or nuclear technology, such as research and medicine...
by the mid-1990s, and provided for some temporary federal storage of waste, including spent fuel from civilian nuclear reactors. State governments were authorized to veto a national government decision to place a waste repository within their borders, and the veto would stand unless both houses of Congress voted to override it. The Act also called for developing plans by 1985 to build monitored retrievable storage (MRS) facilities, where wastes could be kept for 50 to 100 years or more and then be removed for permanent disposal or for reprocessing.
Congress assigned responsibility to the U.S. Department of Energy (DOE) to site, construct, operate, and close a repository for the disposal of spent nuclear fuel and high-level radioactive waste. The U.S. Environmental Protection Agency (EPA) was directed to set public health and safety standards for releases of radioactive materials from a repository, and the U.S. Nuclear Regulatory Commission (NRC) was required to promulgate regulations governing construction, operation, and closure of a repository. Generators and owners of spent nuclear fuel and high-level radioactive waste were required to pay the costs of disposal of such radioactive materials. The waste program, which was expected to cost billions of dollars, would be funded through a fee paid by electric utilities on nuclear-generated electricity. An Office of Civilian Radioactive Waste Management was established in the U.S. Department of Energy (DOE) to implement the Act.
Permanent repositories
The Nuclear waste policy Act required the Secretary of Energy to issue guidelines for selection of sites for construction of two permanent, underground nuclear waste repositories. DOE was to study five potential sites, and then recommend three to the President by January 1, 1985. Five additional sites were to be studied and three of them recommended to the president by July 1, 1989 as possible locations for a second repository. A full environmental impact statement was required for any site recommended to the President.Locations considered to be leading contenders for a permanent repository were basalt formations at the government's Hanford Nuclear Reservation in Washington; volcanic tuff formations at its Nevada nuclear test site, and several salt formations in Utah, Texas, Louisiana and Mississippi. Salt and granite formations in other states from Maine to Georgia had also been surveyed, but not evaluated in great detail.
The President was required to review site recommendations and submit to Congress by March 31, 1987 his recommendation of one site for the first repository, and by March 31, 1990, his recommendation for a second repository. The amount of high-level waste or spent fuel that could be placed in the first repository was limited to the equivalent of 70,000 metric tons of heavy metal until a second repository was built. The Act required the national government to take ownership of all nuclear waste or spent fuel at the reactor site, transport it to the repository, and thereafter be responsible for its containment.
Temporary spent fuel storage
The Act authorized DOE to provide up to 1,900 metric tons of temporary storage capacity for spent fuel from civilian nuclear reactors. It required that spent fuel in temporary storage facilities be moved to permanent storage within three years after a permanent waste repository went into operation. Costs of temporary storage would be paid by fees collected from electric utilities using the storage.Monitored retrievable storage
The Act required the Secretary of Energy to report to Congress by June 1, 1985 on the need for and feasibility of a monitored retrievable storage facility (MRS) and specified that the report was to include five different combinations of proposed sites and facility designs, involving at least three different locations. Environmental assessments were required for the sites. It barred construction of an MRS facility in a state under consideration for a permanent waste repository.State veto of site selected
The Act required DOE to consult closely throughout the site selection process with states or Indian tribes that might be affected by the location of a waste facility, and allowed a state (governor or legislature) or Indian tribe to veto a federal decision to place within its borders a waste repository or temporary storage facility holding 300 tons or more of spent fuel, but provided that the veto could be overruled by a vote of both houses of Congress.Payment of costs
The Act established a Nuclear Waste Fund composed of fees levied against electric utilities to pay for the costs of constructing and operating a permanent repository, and set the fee at one mill per kilowatt-hour of nuclear electricity generated. Utilities were charged a one-time fee for storage of spent fuel created before enactment of the law. Nuclear waste from defense activities was exempted from most provisions of the Act, which required that if military waste were put into a civilian repository, the government would pay its pro rata share of the cost of development, construction and operation of the repository. The Act authorized impact assistance payments to states or Indian tribes to offset any costs resulting from location of a waste facility within their borders.Nuclear Waste Fund
The Nuclear Waste Fund receives almost $750 million in fee revenues each year and has an unspent balance of $25 billion. However (according to the Draft Report by the Blue Ribbon Commission on America’s Nuclear Future), actions by both Congress and the Executive Branch have made the money in the fund effectively inaccessible to serving its original purpose. The commission made several recommendations on how this situation may be corrected.Yucca Mountain
In December 1987, Congress amended the Nuclear Waste Policy Act to designate Yucca MountainYucca Mountain
The Yucca Mountain Nuclear Waste Repository was to be a deep geological repository storage facility for spent nuclear reactor fuel and other high level radioactive waste, until the project was canceled in 2009. It was to be located on federal land adjacent to the Nevada Test Site in Nye County,...
, Nevada as the only site to be characterized as a permanent repository for all of the nation's nuclear waste. The plan was added to the fiscal 1988 budget reconciliation bill signed on December 22, 1987.
Working under the 1982 Act, DOE had narrowed down the search for the first nuclear-waste repository to three Western states: Nevada, Washington and Texas. The amendment repealed provisions in the 1982 law calling for a second repository in the eastern United States. No one from Nevada participated on the House-Senate conference committee on reconciliation.
The amendment explicitly named Yucca Mountain as the only site where DOE was to consider for a permanent repository for the nation's highly radioactive waste. Years of study and procedural steps remained. The amendment also authorized a monitored retrievable storage facility, but not until the permanent repository was licensed.
Early in 2002 the Secretary of Energy recommended Yucca Mountain for the only repository and President Bush approved the recommendation. Nevada exercised its state veto in April 2002 but the veto was overridden by both houses of Congress by mid-July 2002. In 2004, the U.S. Court of Appeals for the District of Columbia Circuit upheld a challenge by Nevada, ruling that EPA’s 10,000-year compliance period for isolation of radioactive waste was not consistent with National Academy of Sciences (NAS) recommendations and was too short. The NAS report had recommended standards be set for the time of peak risk, which might approach a period of one million years By limiting the compliance time to 10,000 years, EPA did not respect a statutory requirement that it develop standards consistent with NAS recommendations. The EPA subsequently revised the standards to extend out to 1 million years. A License Application was submitted in the summer of 2008 and is presently under review by the Nuclear Regulatory Commission.
The Obama Administration
Presidency of Barack Obama
The Presidency of Barack Obama began at noon EST on January 20, 2009 when he became the 44th President of the United States. Obama was a United States Senator from Illinois at the time of his victory over Arizona Senator John McCain in the 2008 presidential election...
rejected use of the site in the 2010 United States Federal Budget
United States federal budget
The Budget of the United States Government is the President's proposal to the U.S. Congress which recommends funding levels for the next fiscal year, beginning October 1. Congressional decisions are governed by rules and legislation regarding the federal budget process...
budget, which eliminated all funding except that needed to answer inquiries from the Nuclear Regulatory Commission, "while the Administration devises a new strategy toward nuclear waste disposal." However, the NWPA is still the federal law and is not a project of the President and can not be canceled by either Obama or Chu. On March 5, 2009, Energy Secretary
United States Secretary of Energy
The United States Secretary of Energy is the head of the United States Department of Energy, a member of the President's Cabinet, and fifteenth in the presidential line of succession. The position was formed on October 1, 1977 with the creation of the Department of Energy when President Jimmy...
Steven Chu
Steven Chu
Steven Chu is an American physicist and the 12th United States Secretary of Energy. Chu is known for his research at Bell Labs in cooling and trapping of atoms with laser light, which won him the Nobel Prize in Physics in 1997, along with his scientific colleagues Claude Cohen-Tannoudji and...
told a Senate hearing the Yucca Mountain site is no longer viewed as an option for storing reactor waste. In Obama's 2011 budget proposal released February 1, all funding for nuclear waste disposal was zeroed out for the next ten years and it proposed to dissolve the Office of Civilian Waste Management required by the NWPA. In late February 2010 multiple lawsuits were proposed and/or being filed in various federal courts across the country to contest the legality of Chu's direction to DOE to withdraw the license application. These lawsuits were evidently foreseen as eventually being necessary to enforce the NWPA since Section 119 of the NWPA provides for federal court interventions if the President, Secretary of Energy or the Nuclear Regulatory Commission fail to uphold the NWPA.
Prerequisites for radioactive waste management
Hannes AlfvénHannes Alfvén
Hannes Olof Gösta Alfvén was a Swedish electrical engineer, plasma physicist and winner of the 1970 Nobel Prize in Physics for his work on magnetohydrodynamics . He described the class of MHD waves now known as Alfvén waves...
, Nobel laureate in physics, described the as yet unresolved dilemma of permanent radioactive waste disposal:
“The problem is how to keep radioactive waste in storage until it decays after hundreds of thousands of years. The [geologic] deposit must be absolutely reliable as the quantities of poison are tremendous. It is very difficult to satisfy these requirements for the simple reason that we have had no practical experience with such a long term project. Moreover permanently guarded storage requires a society with unprecedented stability.”
Thus, Alfvén identified two fundamental prerequisites for effective management of high-level radioactive waste: (1) stable geological formations, and (2) stable human institutions over hundreds of thousands of years. However, no known human civilization has ever endured for so long. Moreover, no geologic formation of adequate size for a permanent radioactive waste repository has yet been discovered that has been stable for so long a period.
Because some radioactive species have half-lives longer than one million years, even very low container leakage and radionuclide migration rates must be taken into account. Moreover, it may require more than one half-life until some nuclear waste loses enough radioactivity so that it is no longer lethal to humans. Waste containers have a modeled lifetime of 12,000 to over 100,000 years and it is assumed they will fail in about two million years. A 1983 review of the Swedish radioactive waste disposal program by the National Academy of Sciences found that country’s estimate of about one million years being necessary for waste isolation “fully justified.”
The Nuclear Waste Policy Act did not require anything approaching this standard for permanent deep-geologic disposal of high-level radioactive waste in the United States. U.S. Department of Energy
guidelines for selecting locations for permanent deep-geologic high-level radioactive waste repositories required containment of waste within waste packages for only 300 years. A site would be disqualified from further consideration only if groundwater travel time from the “disturbed zone” of the underground facility to the “accessible environment” (atmosphere, land surface, surface water, oceans or lithosphere extending no more than 10 kilometers from the underground facility) was expected to be less than 1,000 years along any pathway of radionuclide travel. Sites with groundwater travel time greater than 1,000 years from the original location to the human environment were considered potentially acceptable, even if the waste would be highly radioactive for 200,000 years or more.
Moreover, the term “disturbed zone” was defined in the regulations to exclude shafts drilled into geologic structures from the surface, so the standard applied to natural geologic pathways was more stringent than the standard applied to artificial pathways of radionuclide travel created during construction of the facility.
Repository closure
Current repository closure plans require backfilling of waste disposal rooms, tunnels and shafts with rubble from initial excavation and sealing openings at the surface, but do not require complete or perpetual isolation of radioactive waste from the human environment. Current policy relinquishes control over radioactive materials to geohydrologic processes at repositiory closure. Existing models of these processes are empirically underdetermined, meaning there is not much evidence they are accurate. DOE guidelines contain no requirements for permanent offsite or onsite monitoring after closure. This may seem imprudent considering repositories will contain millions of dollars worth of spent reactor fuel which might be reprocessed and used again either in reactors generating electricity, in weapons applications, or possibly in terrorist activities. Technology for permanently sealing large-bore hole walls against water infiltration or fracture does not currently exist. Previous experiences sealing mine tunnels and shafts have not been entirely successful, especially where there is any hydraulic pressure from groundwater infiltration into disturbed underground geologic structures. Historical attempts to seal smaller bore holes created during exploration for oil, gas and water are notorious for their high failure rates, often in periods less than 50 years.External links