Sochi Olympic Stadium
Encyclopedia
The new Sochi Olympic Stadium will be built in the new Sochi Olympic Park. It will be located within walking distance of the Olympic Village
Olympic Village
An Olympic Village is an accommodation centre built for an Olympic Games, usually within an Olympic Park or elsewhere in a host city. Olympic Villages are built to house all participating athletes, as well as officials, athletic trainers, and other staff. Since the Munich Massacre at the 1972...

 and the capacity of the stadium will be 40,000. The Olympic Stadium
Olympic Stadium
The Olympic Stadium is the name usually given to the big centrepiece stadium of the Summer Olympic Games. Traditionally, the opening and closing ceremonies and the track and field competitions are held in the Olympic Stadium. Many, though not all, of these venues actually contain the words Olympic...

, designed like a shell to recall the glories of Fabergé art, will provide a seaside setting for the Opening and Closing Ceremonies of the 2014 Winter Olympics
2014 Winter Olympics
The 2014 Winter Olympics, officially the XXII Olympic Winter Games, or the 22nd Winter Olympics, is a major international multi-sport event scheduled to be celebrated from 7 to 23 February 2014, in Sochi, Russia with some events held in the resort town of Krasnaya Polyana. Both the Olympic and...

 and Paralympics
2014 Winter Paralympics
The 2014 Winter Paralympics, officially known as the XI Paralympic Winter Games, will be held from March 7 to March 16, 2014 in Sochi, Russia...

.

The stadium walls and roof will be one continuous glass surface designed to reflect sunlight off the sea during the day. The bowl opens to the north, allowing for a direct view of the Krasnaya Polyana Mountains, and the upper deck is open to the south, allowing for a view of the Black Sea
Black Sea
The Black Sea is bounded by Europe, Anatolia and the Caucasus and is ultimately connected to the Atlantic Ocean via the Mediterranean and the Aegean seas and various straits. The Bosphorus strait connects it to the Sea of Marmara, and the strait of the Dardanelles connects that sea to the Aegean...

. The stadium is designed by Populous and Buro Happold
Buro Happold
Buro Happold is a professional services firm providing engineering consultancy, design, planning, project management and consulting services for all aspects of buildings, infrastructure and the environment, with its head office in Bath, Somerset...

. The final design was unveiled in September 2009.

It will cost $
United States dollar
The United States dollar , also referred to as the American dollar, is the official currency of the United States of America. It is divided into 100 smaller units called cents or pennies....

63.5 million to build the venue, including the temporary works for the Olympics. The stadium should open in 2012. The facility will serve as a training centre and venue for the Russian Football National Team after the Games.

Sochi Olympic Stadium is also one of the key stadiums of the 2018 FIFA World Cup
2018 FIFA World Cup
The bidding process for the 2018 and 2022 FIFA World Cups was the process by which the locations for the 2018 and 2022 FIFA World Cups were selected. The process began officially in March 2009; eleven bids from thirteen countries were received, including one which was withdrawn and one that was...

.

External links

The source of this article is wikipedia, the free encyclopedia.  The text of this article is licensed under the GFDL.
 
x
OK