Wengen railway station
Encyclopedia
History
The station was opened on 18 April 1892. In 1899 the station was rebuilt and a depot was constructed. In 1905 the station was reconstructed with level platforms, having previously had an angle of 73°.In 1932 the newspaper kiosk was opened. In 1976 the platforms were constructed.
The station was substantially rebuilt in 1991. A freight depot was constructed underneath the passenger station. The track furthest from the passenger station building is used for the delivery of building materials such as cement, which can be tipped from freight wagons into lineside hoppers.
Next station South: Allmend Allmend railway station Allmend railway station is a request stop station on the Wengernalpbahn in the Swiss canton of Bern.... |
Wengernalpbahn Wengernalpbahn Wengernalpbahn is a 19.091 km long, gauge rack railway line in Switzerland, which runs from Lauterbrunnen and Grindelwald to Kleine Scheidegg, making it the world's longest continuous rack and pinion railway.... |
Next station North: Wengwald Wengwald railway station Wengwald railway station is a request stop station on the Wengernalpbahn in the Swiss canton of Bern.... |