The McDonnell Douglas/General Dynamics A-12 Avenger II was a proposed American
ground-attack aircraft from McDonnell Douglas
and General Dynamics
. It was to be an all-weather, carrier-based stealth
bomber replacement for the Grumman A-6 Intruder in the United States Navy
and Marine Corps
. Its Avenger II name was taken from the Grumman TBF Avenger of World War II.
The development of the A-12 was troubled by cost overruns and several delays, causing questions of the program's ability to deliver upon its objectives; these doubts led to the development program being canceled in 1991. The manner of its cancellation has been contested through litigation to this day.
/General Dynamics
, and Northrop
/Grumman/Vought
in November 1984. The teams were awarded contracts for further concept development in 1986.
The McDonnell Douglas/General Dynamics team was selected as the winner on 13 January 1988, the rival team lead by Grumman surprisingly failed to submit a final bid. The McDonnell Douglas/General Dynamics team was awarded a development contract and the ATA aircraft was designated A-12. The first flight was initially planned for December 1990. The A-12 was named Avenger II in homage to the World War II
-era Navy torpedo-bomber Grumman TBF Avenger.
The Navy initially sought to buy 620 A-12s and Marines wanted 238. In addition, the Air Force briefly considered ordering some 400 of an A-12 derivative. The A-12 was promoted as a possible replacement for the Air Force's General Dynamics F-111 Aardvark, and for the United Kingdom
's Panavia Tornado
fighter-bombers. The craft was a flying wing
design in the shape of an isosceles triangle, with the cockpit situated near the apex of the triangle. The A-12 gained the nickname "Flying Dorito
".
The aircraft was to be powered by two General Electric F412-D5F2 turbofan
engines, each producing about 13000 pound-forces (57.8 kN) of thrust. It was designed to carry precision guided weapons
internally, up to two AIM-120 AMRAAM
air-to-air missiles, two AGM-88 HARM
air-to-ground missiles and a complement of air-to-ground ordnance, including unguided or precision-guided bombs, could be carried in an internal weapons bay. It has been claimed that the A-12 was to be capable of delivering nuclear weapons held in its internal weapons bay as well. The A-12 was to have a weapons load of 5160 pounds (2,340.5 kg).
Beginning in early 1990 McDonnell Douglas and General Dynamics revealed delays and projected cost increases. The weight of the aircraft had significantly increased due to complications with the composite materials used, the weight being 30% over design specification, this was a significantly negative factor for carrier-based operations. Technical difficulties with the complexity of the radar system to be used also caused costs to increase; by one estimate the A-12 was to consume up to 70% of the Navy's budget for aircraft. After delays, its critical design review was successfully completed in October 1990; the A-12's maiden flight was rescheduled to early 1992. In December 1990, it was planned for 14 Navy aircraft carriers to equipped with a wing of 20 A-12s each.
A government report released in November 1990 documented serious problems with the A-12 development program. In December 1990 Secretary of Defense
Dick Cheney
told the Navy to justify the program and deliver reasons why it should not be canceled. The response given by the Navy and the contractors failed to persuade the Secretary of Defense, as he canceled the program in the following month, on 7 January 1991, for breach of contract.
The government felt the contractors could not complete the program and instructed them to repay most of the $2 billion that had been spent on A-12 development. McDonnell Douglas and General Dynamics disputed this in Federal Claims court
; the reasons and causes for the cancellation have been debated and remain an issue of controversy, with suggestions of political expediency and scheming mooted to be behind the action.
and the F-14 Tomcat
. The Super Hornet uses the General Electric F414
turbofan engine, which is a modified variant of the upgraded F404 version developed for the A-12. The full-size A-12 mockup
was revealed to the public at the former Carswell Air Force Base
in June 1996. The cancellation of the A-12 is seen as one of the major losses in the 1990s that weakened McDonnell Douglas and led to its merger with rival Boeing in 1997.
The manner in which the program was canceled led to years of litigation between the contractors and the Department of Defense
over breach of contract. On 1 June 2009, the U.S. Court of Appeals for the Federal Circuit
ruled that the U.S. Navy was justified in canceling the contract. The ruling also required the two contractors to repay the U.S. government more than US$1.35 billion, plus interest charges of US$1.45 billion. Boeing
, which had merged with McDonnell Douglas, vowed to appeal the decision, as has General Dynamics. In September 2010, the U.S. Supreme Court said it would hear the two companies' arguments, that the government canceled the project improperly and that the use of a state secrets claim by the U.S. prevented them from mounting an effective defense. In May 2011, the Supreme Court set aside the Appeals Court decision and returned the case to federal circuit court.
The Lockheed Martin F-35 Lightning II, an in-development carrier-capable fighter featuring stealth technology and oriented toward ground-attack operations, is in effect a successor to the A-12 in both role and industrial origins. Comparisons have been drawn between the role of the future Next-Generation Bomber and the A-12; the two aircraft both being stealthy sub-sonic bombers designed to carry comparable bomb loads and fly similar ranges.
United States
The United States of America is a federal constitutional republic comprising fifty states and a federal district...
ground-attack aircraft from McDonnell Douglas
McDonnell Douglas
McDonnell Douglas was a major American aerospace manufacturer and defense contractor, producing a number of famous commercial and military aircraft. It formed from a merger of McDonnell Aircraft and Douglas Aircraft in 1967. McDonnell Douglas was based at Lambert-St. Louis International Airport...
and General Dynamics
General Dynamics
General Dynamics Corporation is a U.S. defense conglomerate formed by mergers and divestitures, and as of 2008 it is the fifth largest defense contractor in the world. Its headquarters are in West Falls Church , unincorporated Fairfax County, Virginia, in the Falls Church area.The company has...
. It was to be an all-weather, carrier-based stealth
Stealth aircraft
Stealth aircraft are aircraft that use stealth technology to avoid detection by employing a combination of features to interfere with radar as well as reduce visibility in the infrared, visual, audio, and radio frequency spectrum. Development of stealth technology likely began in Germany during...
bomber replacement for the Grumman A-6 Intruder in the United States Navy
United States Navy
The United States Navy is the naval warfare service branch of the United States Armed Forces and one of the seven uniformed services of the United States. The U.S. Navy is the largest in the world; its battle fleet tonnage is greater than that of the next 13 largest navies combined. The U.S...
and Marine Corps
United States Marine Corps
The United States Marine Corps is a branch of the United States Armed Forces responsible for providing power projection from the sea, using the mobility of the United States Navy to deliver combined-arms task forces rapidly. It is one of seven uniformed services of the United States...
. Its Avenger II name was taken from the Grumman TBF Avenger of World War II.
The development of the A-12 was troubled by cost overruns and several delays, causing questions of the program's ability to deliver upon its objectives; these doubts led to the development program being canceled in 1991. The manner of its cancellation has been contested through litigation to this day.
ATA program
The United States Navy began the Advanced Tactical Aircraft (ATA) program in 1983. The program was to develop and field a replacement for the A-6 Intruder by 1994. Stealth technology developed for the United States Air Force would be used heavily in the program. Concept design contracts were awarded to the industry teams of McDonnell DouglasMcDonnell Douglas
McDonnell Douglas was a major American aerospace manufacturer and defense contractor, producing a number of famous commercial and military aircraft. It formed from a merger of McDonnell Aircraft and Douglas Aircraft in 1967. McDonnell Douglas was based at Lambert-St. Louis International Airport...
/General Dynamics
General Dynamics
General Dynamics Corporation is a U.S. defense conglomerate formed by mergers and divestitures, and as of 2008 it is the fifth largest defense contractor in the world. Its headquarters are in West Falls Church , unincorporated Fairfax County, Virginia, in the Falls Church area.The company has...
, and Northrop
Northrop Corporation
Northrop Corporation was a leading United States aircraft manufacturer from its formation in 1939 until its merger with Grumman to form Northrop Grumman in 1994. The company is known for its development of the flying wing design, although only a few of these have entered service.-History:Jack...
/Grumman/Vought
Vought
Vought is the name of several related aerospace firms. These have included, in the past, Lewis and Vought Corporation, Chance Vought, Vought Sikorsky, LTV Aerospace , Vought Aircraft Companies, and the current Vought Aircraft Industries. The first incarnation of Vought was established by Chance M...
in November 1984. The teams were awarded contracts for further concept development in 1986.
The McDonnell Douglas/General Dynamics team was selected as the winner on 13 January 1988, the rival team lead by Grumman surprisingly failed to submit a final bid. The McDonnell Douglas/General Dynamics team was awarded a development contract and the ATA aircraft was designated A-12. The first flight was initially planned for December 1990. The A-12 was named Avenger II in homage to the World War II
World War II
World War II, or the Second World War , was a global conflict lasting from 1939 to 1945, involving most of the world's nations—including all of the great powers—eventually forming two opposing military alliances: the Allies and the Axis...
-era Navy torpedo-bomber Grumman TBF Avenger.
The Navy initially sought to buy 620 A-12s and Marines wanted 238. In addition, the Air Force briefly considered ordering some 400 of an A-12 derivative. The A-12 was promoted as a possible replacement for the Air Force's General Dynamics F-111 Aardvark, and for the United Kingdom
United Kingdom
The United Kingdom of Great Britain and Northern IrelandIn the United Kingdom and Dependencies, other languages have been officially recognised as legitimate autochthonous languages under the European Charter for Regional or Minority Languages...
's Panavia Tornado
Panavia Tornado
The Panavia Tornado is a family of twin-engine, variable-sweep wing combat aircraft, which was jointly developed and manufactured by the United Kingdom, West Germany and Italy...
fighter-bombers. The craft was a flying wing
Flying wing
A flying wing is a tailless fixed-wing aircraft which has no definite fuselage, with most of the crew, payload and equipment being housed inside the main wing structure....
design in the shape of an isosceles triangle, with the cockpit situated near the apex of the triangle. The A-12 gained the nickname "Flying Dorito
Doritos
Doritos is a brand of seasoned tortilla chips created by Arch West and produced since 1964 by the American food company Frito-Lay ....
".
The aircraft was to be powered by two General Electric F412-D5F2 turbofan
Turbofan
The turbofan is a type of airbreathing jet engine that is widely used for aircraft propulsion. A turbofan combines two types of engines, the turbo portion which is a conventional gas turbine engine, and the fan, a propeller-like ducted fan...
engines, each producing about 13000 pound-forces (57.8 kN) of thrust. It was designed to carry precision guided weapons
Precision-guided munition
A precision-guided munition is a guided munition intended to precisely hit a specific target, and to minimize damage to things other than the target....
internally, up to two AIM-120 AMRAAM
AIM-120 AMRAAM
The AIM-120 Advanced Medium-Range Air-to-Air Missile, or AMRAAM , is a modern beyond-visual-range air-to-air missile capable of all-weather day-and-night operations. Designed with the same form-factor as the previous generation of semi-active guided Sparrow missiles, it is a fire-and-forget...
air-to-air missiles, two AGM-88 HARM
AGM-88 HARM
The AGM-88 High-speed Anti-Radiation Missile is a tactical, air-to-surface missile designed to home in on electronic transmissions coming from surface-to-air radar systems. It was originally developed by Texas Instruments as a replacement for the AGM-45 Shrike and AGM-78 Standard ARM system...
air-to-ground missiles and a complement of air-to-ground ordnance, including unguided or precision-guided bombs, could be carried in an internal weapons bay. It has been claimed that the A-12 was to be capable of delivering nuclear weapons held in its internal weapons bay as well. The A-12 was to have a weapons load of 5160 pounds (2,340.5 kg).
Beginning in early 1990 McDonnell Douglas and General Dynamics revealed delays and projected cost increases. The weight of the aircraft had significantly increased due to complications with the composite materials used, the weight being 30% over design specification, this was a significantly negative factor for carrier-based operations. Technical difficulties with the complexity of the radar system to be used also caused costs to increase; by one estimate the A-12 was to consume up to 70% of the Navy's budget for aircraft. After delays, its critical design review was successfully completed in October 1990; the A-12's maiden flight was rescheduled to early 1992. In December 1990, it was planned for 14 Navy aircraft carriers to equipped with a wing of 20 A-12s each.
A government report released in November 1990 documented serious problems with the A-12 development program. In December 1990 Secretary of Defense
United States Secretary of Defense
The Secretary of Defense is the head and chief executive officer of the Department of Defense of the United States of America. This position corresponds to what is generally known as a Defense Minister in other countries...
Dick Cheney
Dick Cheney
Richard Bruce "Dick" Cheney served as the 46th Vice President of the United States , under George W. Bush....
told the Navy to justify the program and deliver reasons why it should not be canceled. The response given by the Navy and the contractors failed to persuade the Secretary of Defense, as he canceled the program in the following month, on 7 January 1991, for breach of contract.
The government felt the contractors could not complete the program and instructed them to repay most of the $2 billion that had been spent on A-12 development. McDonnell Douglas and General Dynamics disputed this in Federal Claims court
United States Court of Federal Claims
The United States Court of Federal Claims is a United States federal court that hears monetary claims against the U.S. government. The court is established pursuant to Congress's authority under Article One of the United States Constitution...
; the reasons and causes for the cancellation have been debated and remain an issue of controversy, with suggestions of political expediency and scheming mooted to be behind the action.
Aftermath
After the cancellation of the A-12, the Navy elected to purchase the F/A-18E/F Super Hornet, which went on to replace the A-6 IntruderA-6 Intruder
The Grumman A-6 Intruder was an American, twin jet-engine, mid-wing attack aircraft built by Grumman Aerospace. In service with the U.S. Navy and U.S. Marine Corps between 1963 and 1997, the Intruder was designed as an all-weather medium attack aircraft to replace the piston-engined A-1 Skyraider...
and the F-14 Tomcat
F-14 Tomcat
The Grumman F-14 Tomcat is a supersonic, twin-engine, two-seat, variable-sweep wing fighter aircraft. The Tomcat was developed for the United States Navy's Naval Fighter Experimental program following the collapse of the F-111B project...
. The Super Hornet uses the General Electric F414
General Electric F414
The General Electric F414 is an afterburning turbofan engine in the 22,000 lbf thrust class produced by GE Aviation. The F414 was developed from GE's widely-used F404 turbofan for use in the Boeing F/A-18E/F Super Hornet.-Origin:...
turbofan engine, which is a modified variant of the upgraded F404 version developed for the A-12. The full-size A-12 mockup
Mockup
In manufacturing and design, a mockup, or mock-up, is a scale or full-size model of a design or device, used for teaching, demonstration, design evaluation, promotion, and other purposes...
was revealed to the public at the former Carswell Air Force Base
Naval Air Station Joint Reserve Base Fort Worth
Naval Air Station Fort Worth Joint Reserve Base or NAS Fort Worth JRB includes Carswell Field, a military airfield located west of the central business district of Fort Worth, in Tarrant County, Texas, United States. This military airfield is operated by United States Navy...
in June 1996. The cancellation of the A-12 is seen as one of the major losses in the 1990s that weakened McDonnell Douglas and led to its merger with rival Boeing in 1997.
The manner in which the program was canceled led to years of litigation between the contractors and the Department of Defense
United States Department of Defense
The United States Department of Defense is the U.S...
over breach of contract. On 1 June 2009, the U.S. Court of Appeals for the Federal Circuit
United States Court of Appeals for the Federal Circuit
-Vacancies and pending nominations:-List of former judges:-Chief judges:Notwithstanding the foregoing, when the court was initially created, Congress had to resolve which chief judge of the predecessor courts would become the first chief judge...
ruled that the U.S. Navy was justified in canceling the contract. The ruling also required the two contractors to repay the U.S. government more than US$1.35 billion, plus interest charges of US$1.45 billion. Boeing
Boeing
The Boeing Company is an American multinational aerospace and defense corporation, founded in 1916 by William E. Boeing in Seattle, Washington. Boeing has expanded over the years, merging with McDonnell Douglas in 1997. Boeing Corporate headquarters has been in Chicago, Illinois since 2001...
, which had merged with McDonnell Douglas, vowed to appeal the decision, as has General Dynamics. In September 2010, the U.S. Supreme Court said it would hear the two companies' arguments, that the government canceled the project improperly and that the use of a state secrets claim by the U.S. prevented them from mounting an effective defense. In May 2011, the Supreme Court set aside the Appeals Court decision and returned the case to federal circuit court.
The Lockheed Martin F-35 Lightning II, an in-development carrier-capable fighter featuring stealth technology and oriented toward ground-attack operations, is in effect a successor to the A-12 in both role and industrial origins. Comparisons have been drawn between the role of the future Next-Generation Bomber and the A-12; the two aircraft both being stealthy sub-sonic bombers designed to carry comparable bomb loads and fly similar ranges.