Narragansett Regional High School
Encyclopedia
Narragansett Regional High School (NRHS) is a public high school
serving students from the towns of Templeton, Massachusetts
and Phillipston, Massachusetts
. It enrolled 497 students as of the 2006-2007 school year. The current principal is Shawn Rickan, and the Vice Principal is Peter J. Cushing. The superintendent of Narragansett Regional School District is Dr. Roseli Weiss. The school is located in the village of Baldwinville
which is part of Templeton. In 2010, a multi-million dollar project to erect a 1.5 megawatt wind turbine
was completed behind the school's practice field. The turbine was named after John LeClerc, a middle school technology teacher who contributed his time and energy to the project.
High school
High school is a term used in parts of the English speaking world to describe institutions which provide all or part of secondary education. The term is often incorporated into the name of such institutions....
serving students from the towns of Templeton, Massachusetts
Templeton, Massachusetts
Templeton is a town in Worcester County, Massachusetts, United States. The population was 8,013 at the 2010 census. The town comprises four main villages: Templeton Center, East Templeton, Baldwinville, and Otter River...
and Phillipston, Massachusetts
Phillipston, Massachusetts
Phillipston is a town in Worcester County, Massachusetts, United States. The population was 1,682 at the 2010 census.- History :Phillipston was first settled in 1751, and incorporated as the town of Gerry in 1786...
. It enrolled 497 students as of the 2006-2007 school year. The current principal is Shawn Rickan, and the Vice Principal is Peter J. Cushing. The superintendent of Narragansett Regional School District is Dr. Roseli Weiss. The school is located in the village of Baldwinville
Baldwinville, Massachusetts
Baldwinville is an unincorporated village and census-designated place in the town of Templeton in Worcester County, Massachusetts, United States. The population was 2,028 at the 2010 census. The name also refers to the local post office or railroad station...
which is part of Templeton. In 2010, a multi-million dollar project to erect a 1.5 megawatt wind turbine
Wind turbine
A wind turbine is a device that converts kinetic energy from the wind into mechanical energy. If the mechanical energy is used to produce electricity, the device may be called a wind generator or wind charger. If the mechanical energy is used to drive machinery, such as for grinding grain or...
was completed behind the school's practice field. The turbine was named after John LeClerc, a middle school technology teacher who contributed his time and energy to the project.